A strong barn or shop starts with a solid pad. If you plan the layout, clear the site, and build the base the right way, your building will last longer and need less maintenance. The fastest way to get that done is with smart equipment choices and a clear workflow. This guide lays out each step, compares machines, and shows how bulldozer rental can save time and money. When you are ready to get to work, CIS Equipment Rental in Union Grove, Wisconsin can help you secure the right machine for your timeline and budget.

Plan the Pad: Location, Slope, and Permits

Choose the right location

Start by picking a site with good access, natural drainage, and room for trucks and materials. The area should be large enough for the building footprint plus a working buffer of at least 10 feet around it. If the site is low, plan on importing fill or building a strategic swale to move water away.

Confirm size and elevations

Mark your building corners with stakes and paint. Shoot elevations at each corner and several points inside and outside the pad. Your target finished pad should sit at least 6 inches higher than the surrounding grade. A slope of 1 to 2 percent away from the building helps water run off cleanly.

Call in utility locates and check permits

Before any blade touches the ground, call for utility locates. Many states require it by law. Review local zoning, set-backs, and stormwater rules. Some locations need erosion control measures at the start, such as silt fence or wattles. Have this ready before clearing begins.

Step-by-Step Barn or Shop Pad Build

1. Pre-marking and layout

Square the pad using the 3-4-5 method or a laser. Pull string lines to define the edges and set a benchmark for your base elevation. This is your reference for the rest of the work.

2. Clearing and stripping

Remove trees, brush, rocks, and debris. Strip topsoil across the footprint and stockpile it for later landscaping. Topsoil is organic and not suitable for structural base. A dozer with a 6-way blade makes quick work of brush and shallow roots while keeping the site smooth for the next step.

3. Cut and fill

Use cut material from high areas to fill low spots inside the pad area. Keep lifts thin for compaction. For general fill, aim for 6 to 8 inch loose lifts before compacting. Tease out wet or soft zones and either dry them out with the sun and wind or bridge them with geotextile and stone.

4. Drainage and subgrade improvements

Shape shallow swales to divert water around the pad. If the site has clay or poor soils, install geotextile fabric over the subgrade before placing base stone. This reduces pumping and rutting. In very soft areas, consider a layer of larger stone first to create a working platform.

5. Base layers and compaction

Place graded aggregate base in lifts. A common blend is 3/4 inch crushed stone with fines for locking up tight. For light duty shops, 6 inches of compacted base is a good starting point. For larger barns with equipment traffic, plan for 8 to 12 inches. Compact each lift to a firm, unyielding surface. If you see rutting, add more stone or dry the area before proceeding.

6. Final grading and proof roll

Trim the pad to final grade with a dozer or track loader using a laser or GPS display. Run a loaded truck or roller over the surface for a proof roll. If the surface deflects, correct it now rather than later. The finished pad should be smooth, well compacted, and at the target elevation with a consistent slope.

7. Pad ready for concrete or gravel top

Once base compaction is confirmed, the site is ready for forms and concrete or a gravel surface, depending on your plan. Keep heavy traffic off the pad after final grading until the building phase begins.

What Equipment Speeds Up the Job

Bulldozer rental vs other machines

The right machine can cut your schedule by days. Bulldozer rental is the standard choice for pad work because a dozer handles clearing, rough grading, and fine grading with speed and control. A dozer with low ground pressure tracks performs well on soft soils and spreads fill smoothly.

  • Bulldozer rental: Best for clearing, stripping, cut and fill, and final shaping. A dozer with a 6-way blade is ideal for precise grading. Low ground pressure tracks improve flotation on soft ground.
  • Track loader: Great for loading and moving base stone, backfilling, and shaping edges. It can also handle grading but will be slower than a dozer over large areas.
  • Excavator: Essential for tree removal, digging out stumps, trenching for drainage, and shaping swales or ditches. Pairs well with a dozer on complex sites.
  • Roller or compactor: Needed for dense, uniform base layers. A smooth drum with vibration handles crushed stone, while a padfoot works better on cohesive soils.
  • Laser or GPS grade system: Adds accuracy and speed during final grading. A simple laser receiver on a mast can improve results even for first-time operators.

CIS Equipment Rental keeps popular models ready so you can match machine to task. Current options include a 2017 Cat D5K2 LGP at 600 dollars per day, a 2023 CAT 259D3 at 400 dollars per day, and a 2019 CAT 315 at 700 dollars per day. Contact David Schaefer at CIS Equipment Rental at 262-977-8811 or sales@cisequipment.com to schedule the machines you need. Their team helps you plan delivery and pickup so you do not lose time.

Why a dozer often wins on pad work

Dozers push material efficiently, cut high spots cleanly, and feather edges without constant bucket changes. On a 60 by 80 foot pad, a skilled operator on a mid-size dozer can rough grade in a day under normal conditions. A track loader alone can do the job but usually takes longer due to smaller bite sizes and more repositioning. Many crews combine a dozer for grading with a track loader for stone transport. This keeps the dozer grading while the loader feeds stone and maintains production.

Production Rates and Timelines

Production speeds vary with soil, moisture, and haul distances. The numbers below are typical benchmarks for planning.

  • Clearing and stripping: 0.25 to 0.5 acre per day with a dozer when vegetation is light to moderate. Add time for large stumps.
  • Rough cut and fill: 300 to 600 cubic yards per day with a mid-size dozer in short pushes. Expect slower rates on wet, sticky clays.
  • Base placement: 150 to 300 tons per day when a loader or skid steer feeds stone and a dozer spreads it.
  • Compaction: One roller can keep up with base placement if lifts are 6 to 8 inches.

For a 40 by 60 foot pad with 8 inches of base, clearing and stripping may take half a day, cut and fill another half day, base placement one day, and final grading a half day. Many small pads can be ready in two to three working days if trucks, materials, and equipment are staged well.

Material Choices for a Solid Base

Strong pads start with the right materials and smart layering. The subgrade is the natural ground under the pad. It should be stable and free of topsoil. If soils are poor or wet, use geotextile fabric to separate the subgrade from the base. This keeps fines from pumping into the stone. For the structural base, use a graded aggregate with fines that compacts tight. Common mixes include 3/4 inch minus or 1 inch minus crushed stone. For wet areas, start with larger stone like 2 inch rock to create a working platform before capping with finer base.

  • Light duty shops and barns: 6 inches compacted base over firm subgrade, slope 1 to 2 percent away from the building.
  • Equipment barns and high traffic areas: 8 to 12 inches compacted base, often in two or more lifts with geotextile underlayment.
  • Drainage features: Shallow swales, French drains along uphill edges, and downspout extensions to keep water off the pad.

Always compact in thin lifts and check the surface with a proof roll. If the stone deforms under load, add more lift thickness or dry it out and compact again.

Cost Breakdown and How Rental Choices Affect Budget

Bulldozer rental reduces labor hours and shortens your schedule, which often saves money even when the daily rate is higher than smaller machines. CIS Equipment Rental offers clear daily pricing so you can build a realistic budget.

  • Dozer: 2017 Cat D5K2 LGP at 600 dollars per day
  • Track loader: 2023 CAT 259D3 at 400 dollars per day
  • Excavator: 2019 CAT 315 at 700 dollars per day

For a mid-size pad, a common setup is a dozer plus a track loader for two to three days, and an excavator for one day if you have stumps, trenches, or deep drainage work. Materials will be your next largest cost. Base stone pricing varies by region, but the faster you spread and compact it, the less you pay in trucking standby or extra labor hours. Add fuel, delivery, and pickup to the plan. CIS Equipment Rental can provide delivery options that fit your schedule and help you avoid idle time.

Safety and Utility Locate Checklist

  • Get utility locates and mark all lines before digging.
  • Set up a clear site entrance with room for trucks to pass.
  • Stage materials out of travel paths and away from slopes.
  • Keep bystanders outside the swing and push zones.
  • Use a spotter during truck backing and tight grading.
  • Check weather and stop work during lightning or high winds.
  • Wear seat belts, high visibility gear, gloves, and eye protection.

Common Mistakes to Avoid

  • Skipping topsoil stripping and building base on organic soils.
  • Placing thick lifts that do not compact well.
  • Not addressing drainage, which leads to soft spots and frost heave.
  • Ignoring proof rolling results and pouring concrete on a weak base.
  • Using the wrong machine for the task and losing production.
  • Failing to plan deliveries, which causes idle equipment time.

Weather and Seasonal Tips

Wet conditions

Wet ground slows everything. Use geotextile fabric and a layer of larger stone to bridge soft zones. Choose a dozer with low ground pressure to reduce rutting. Delay fine grading until the surface tightens up.

Cold weather and frost

Frost can lift and crack slabs. Build thicker base and focus on drainage. Avoid trapping water in the base. If the ground is frozen, scarify, warm with sunlight if possible, and recompact before placing stone.

Hot weather

Rock can dry fast and dust out. Use water trucks or light watering to aid compaction, but avoid soaking the base. Work early and late to avoid heat-related slowdowns.

FAQ: Bulldozer Rental for Barn and Shop Pads

When should I choose a dozer over a skid steer? A dozer grades faster across larger areas and handles cut and fill more efficiently. Use a skid steer or track loader for moving stone and tight access work.

How big of a dozer do I need? For typical barn and shop pads, a mid-size dozer with a 6-way blade is ideal. It offers a balance of push power and fine control without being hard to transport.

Can I self-perform or do I need a pro operator? Many builders self-perform with guidance. If you are new to equipment, ask CIS Equipment Rental for operator tips. They can help you match machine to skill level and site needs.

What about LGP tracks? Low ground pressure tracks spread weight and reduce rutting in soft soils. The Cat D5K2 LGP at CIS Equipment Rental is a smart choice for wet or loose ground.

What is the biggest time saver during pad work? Clear planning and staging. Have stone on site when you need it, and use the right machine for each step. Bulldozer rental paired with a track loader keeps production steady.

Why Choose CIS Equipment Rental

CIS Equipment Rental serves Union Grove, Wisconsin and nearby areas with well maintained machines and a team that understands sitework. Their lineup includes the 2017 Cat D5K2 LGP dozer at 600 dollars per day, the 2023 CAT 259D3 track loader at 400 dollars per day, and the 2019 CAT 315 excavator at 700 dollars per day. If you want dependable bulldozer rental for barn or shop pad layouts, their fleet is set up for clearing, grading, and base preparation. Contact David Schaefer at 262-977-8811 or sales@cisequipment.com to book your equipment, confirm availability, and schedule delivery. CIS Equipment Rental can help you choose attachments and grade tools, and they will review transport details so your machines arrive ready to work.

A Sample 3-Day Pad Plan

  1. Day 1: Clearing and stripping. Dozer removes brush and topsoil. Excavator pulls stumps and digs any swales. Stockpile topsoil for later. End the day with a level subgrade.
  2. Day 2: Cut and fill, drainage, and base start. Dozer balances cut and fill. Install geotextile in soft areas. Track loader delivers base stone while the dozer spreads it. Start compaction in 6 to 8 inch lifts.
  3. Day 3: Finish base and final grade. Continue compaction to full thickness, then trim grade with laser guidance. Proof roll and correct any soft areas. The pad is ready for forms or a gravel finish.

Operator Tips That Improve Speed

  • Work in passes and keep your push distance short. Move material in stages rather than long pushes.
  • Feather edges with the dozer’s 6-way blade to avoid windrows that need rework.
  • Keep stone deliveries steady. A loader feeding the dozer prevents downtime.
  • Use a laser receiver for fast, accurate final grading.
  • Compact in thin lifts and verify with a proof roll before adding the next lift.

Get Started Today

A clean layout, solid base, and the right machines will turn your barn or shop pad into a fast, repeatable project. Bulldozer rental is often the fastest path to a true finish grade and a pad that drains well. Pair that with a track loader and an excavator if your site includes stumps or drainage features. CIS Equipment Rental in Union Grove stands ready with reliable machines and straight answers. Reserve the 2017 Cat D5K2 LGP, the 2023 CAT 259D3, or the 2019 CAT 315, and streamline your build from day one. Call David Schaefer at 262-977-8811 or email sales@cisequipment.com to schedule your rental and lock in delivery. Build it right, build it fast, and start your barn or shop project on a pad that will perform for years.